OFFERS CONDITIONS
Discount of -60% in the budget of the preliminary project
.
When contracting with us the development of a preliminary project, for the reform of your home or commercial premises, you are contracting the following services:
Study of the brand (in the case of commercial premises) or study of the client. To be able to capture their ideas and needs and in this way adapt the space to those ideas and needs.
Realization of plans of the current and renovated state with the final distribution of the house or commercial premises.
Making sketches, renders and any other type of digital images to understand the proposal we make.
A report detailing the main materials of the project and / or the chosen furniture and / or decoration.
Measurement visits, meetings necessary for the development of the preliminary project with clients and recommendations and / or visits to stores or warehouses of materials, furniture or decoration.
CONDITIONS OF THE OFFER .
.
Discount applicable, if and only if, Pantea is contracted both for the realization of the preliminary project and for the development of the entire reform.
The discount will only be applied in integral renovation projects, in no case will the discount of -60% be applied in partial renovations (Example: making a preliminary design for the decoration of a bedroom or room does not have a discount).
The full price of the preliminary project must be paid to carry it out. Once the work has begun, the part paid corresponding to the discount will be deducted in the first payment of the reform.
No returns of any kind are made in the event that the work is not finally carried out with us.
Offer valid during the month of February 2021. The offer will be maintained when making the first payment necessary to start carrying out the preliminary project.
The validity of the discounts applied will be valid for a maximum of 6 months or 182 calendar days, once the conditions sheet has been signed and the payment made. After this time, the discounts applied in the reform budget will be lost. With the exception of the discount in the preliminary draft that will be valid for a maximum of 1 year or 365 calendar days.
Taking as a reference the time elapsed for the offer from the moment of signing the general conditions of the reform budget and the full payment of the preliminary project or the signal, until the date marked as the start of work. In the event that Pantea does not have the availability to begin the work within the time stipulated for the application of the offer, it will be maintained, as long as an approximate date has been set for the beginning of the work within 365 days natural, having as their starting point the day of signing the general conditions attached to the budget. (Both parties signing the work start date sheet before the end of the 6 months or 182 calendar days).
Discount of up to -30% on screens, shower trays and bathroom furniture.
.
This offer is referred to a selection of products for screens, shower trays and bathroom furniture. To know the products that are on offer, contact us.
.
CONDITIONS OF THE OFFER
.
Discount applicable, if and only if, Pantea is contracted to carry out the reform.
The discount will only be applied if the reform budget exceeds € 3,500.00 WITHOUT VAT.
Discount applicable only on the supply of said products. The labor for assembly or installation is not included in the discount.
Offer valid during the month of February 2021. The offer will be maintained when making the payment of a signal corresponding to 5% of the budget. The signal will not be necessary if the preliminary project has been contracted, the payment of the preliminary project will maintain the discounts.
The discount reservation must be made before the end of February 2021 by signing the conditions sheet that will be attached with the budget and with the payment of the signal.
The validity of the discount will be a maximum of 6 months or 182 calendar days, once the conditions sheet has been signed and the down payment has been made. After this time, both the deposit and the discounts applied in the reform budget will be lost.
Taking as a reference the time elapsed for the offer from the moment of signing the general conditions of the reform budget and the full payment of the preliminary project or the signal, until the date marked as the start of work. In the event that Pantea does not have the availability to begin the work within the time stipulated for the application of the offer, it will be maintained, as long as an approximate date has been set for the beginning of the work within 365 days natural, having as their starting point the day of signing the general conditions attached to the budget. (Both parties signing the work start date sheet before the end of the 6 months or 182 calendar days).
-20% discount on painting and smoothing of walls.
.
This offer is applied to the smoothing and painting of the walls, including both the labor and the material within said discount.
.
CONDITIONS OF THE OFFER
.
Discount applicable, if and only if, Pantea is contracted to carry out the reform.
The discount will only be applied if the reform budget exceeds € 2000.00 WITHOUT VAT.
Offer valid during the month of February 2021. The offer will be maintained when making the payment of a signal corresponding to 5% of the budget. The signal will not be necessary if the preliminary project has been contracted, the payment of the preliminary project will maintain the discounts.
The discount reservation must be made before the end of February 2021 by signing the conditions sheet that will be attached with the budget and with the payment of the signal.
The validity of the discount will be a maximum of 6 months or 182 calendar days, once the conditions sheet has been signed and the down payment has been made. After this time, both the deposit and the discounts applied in the reform budget will be lost.
Taking as a reference the time elapsed for the offer from the moment of signing the general conditions of the reform budget and the full payment of the preliminary project or the signal, until the date marked as the start of work. In the event that Pantea does not have the availability to begin the work within the time stipulated for the application of the offer, it will be maintained, as long as an approximate date has been set for the beginning of the work within 365 days natural, having as their starting point the day of signing the general conditions attached to the budget. (Both parties signing the work start date sheet before the end of the 6 months or 182 calendar days).
Discount of -25% on pallet supply
This offer is related to a selection of floating floors in different types of finishes. To know the products that are on offer, contact us.
Discount applicable, if and only if, Pantea is contracted to carry out the reform.
The discount will only be applied if the supply price of the laminate flooring exceeds € 1200.00 WITHOUT VAT.
Discount applicable only on the supply of said products. The labor for assembly or installation is not included in the discount.
Offer valid during the month of February 2021. The offer will be maintained when making the payment of a signal corresponding to 5% of the budget. The signal will not be necessary if the preliminary project has been contracted, the payment of the preliminary project will maintain the discounts.
The discount reservation must be made before the end of February 2021 by signing the conditions sheet that will be attached with the budget and with the payment of the signal.
The validity of the discount will be a maximum of 6 months or 182 calendar days, once the conditions sheet has been signed and the down payment has been made. After this time, both the deposit and the discounts applied in the reform budget will be lost.
Taking as a reference the time elapsed for the offer from the moment of signing the general conditions of the reform budget and the full payment of the preliminary project or the signal, until the date marked as the start of work. In the event that Pantea does not have the availability to begin the work within the time stipulated for the application of the offer, it will be maintained, as long as an approximate date has been set for the beginning of the work within 365 days natural, having as their starting point the day of signing the general conditions attached to the budget. (Both parties signing the work start date sheet before the end of the 6 months or 182 calendar days).
GENERAL
OFFERS VALID UNTIL 02/28/2021 AT 11:59 PM.
All offers can be applied to the same budget, maintaining the aforementioned conditions. PANTEA reserves the right to modify the offer based on stock and availability. For more information contact us by email or phone.
Phone: 644625145
Email: rgpantea@gmail.com